Friday, January 11, 2008

Avery Table Tents Template














* 595m ² / 480m ² colonial style very commercial Kouba (the apprevale) should seat company, any business imaginable clinic (a tear)


* colonial villa very commercial sources 20m frontage (360m ² / 80m ²) (to demolish)












* villa 480m ² 03 facades colonial center sources
(to demolish)
* villa 600m ² very commercial 25 m Facade
orchards (to demolish)



pearl sources!
a council estate has your odds


Planning
PERMIT to subdivide

Decree 91-176 of 28 May 1991 fixing the modalities of instruction and issuance of planning acts, as amended and supplemented
1. Subject: Operation of division into two or more lots of land.
2. Administrative Record: - Application of the owner or his agent-copy of the deed of ownership or mandate.
3. Technical file: - Map - Maps of channels and networks to achieve - Specification.
4. Repository: APC's location field.

5. Delivery Time: - 3 months, the P / APC - in the presence of the POS-4 months, the P / APC - in the absence of POS-4 months, Wali, for subdivisions located in specific areas - 4 months by the Minister for Planning for structuring projects of national or regional
6. Suspension saturate maximum 1 year if an instrument of development and planning is under development.
7. Remedies: Right of introduction of a disciplinary complaint or legal action.
Note: The subdivision permit is considered null and void if work:
- are not undertaken within 3 year - are not completed within the time (maximum 3 years).

BUILDING PERMITS

Decree 91-176 of 28 May 1991 fixing the modalities of instruction and issuance of planning acts, as amended and supplemented
1 . Subject: Construction or conversion of building whatever the location.
2. Administrative and technical file: Compiled by the Architect.
3. Repository: APC's location of the building.

4. Delivery period: 3 months by the P / APC in the presence of POS for projects not covered by the Wali or the Minister, four months, the P / APC - in the absence of POS for projects outside the wali or the Minister, 4 months, Wali for constructions and installations carried out on behalf of the State and the Prefecture, 4 months, the Minister for Planning for structuring projects of national interest or regional level.
5. Stay of proceedings: Maximum 1 year, if an instrument of development and planning is under development.
6. Remedies: Right of bringing an action or a hierarchical action.
NB: The building permit is considered null and void if work has not commenced or completed within the time limit.

demolition permit

Decree 91-176 of 28 May 1991 fixing the modalities of instruction and delivery of instruments of urban planning, and amended Completed
1. Subject: total or partial demolition of a building located in a specific area or when the technical and safety require.
2. Administrative and technical file : Prepared by the Architect.
3. Repository: APC's location of the construction.4. Delivery period: 3 months by the P / APC
5. Remedies: Right of introduction of a disciplinary complaint or legal action.
NB: The demolition permit is considered null and void if: - The demolition has not taken place after 5 years - Work is suspended for 3 years - annulled by court order.

CERTIFICATE OF PLANNING

Decree 91-176 of 28 May 1991 laying down detailed instruction and issue of planning acts, as amended and supplemented
1. Purpose: Indicates the building rights and easements affecting the land concerned.

2. Administrative record and technical
3. Repository: APC's location of terrain.4. Delivery Time: 2 months after filing the application.
5. Stay of proceedings: Maximum 1 year, if an instrument of development and planning is under development.
6. Remedies: Right of introduction of an administrative appeal or action justice.NB: The planning is deemed to have lapsed, one year after its notification.

CERTIFICATE OF COMPLIANCE

Decree 91-176 of 28 May 1991 fixing the modalities of instruction and issuance of planning acts, as amended and supplemented
1. Subject: Compliance work and is allowed to live or operation of the building.

2. File: Declaration of completion.
3. Repository: APC's location construction.

4. Delivery period: 3 months by the P / APC for projects within its compétence.3 months, Wali for projects within its jurisdiction and that of the Minister.
NB: The certificate of conformity is mandatory to establish the ownership of the building completed.

CERTIFICATE OF GRIND

Decree 91-176 of 28 May 1991 fixing the modalities of instruction and issuance planning acts, as amended and supplemented
1. Subject: Information on possible division into two or more lots of land built.

2. Administrative record and technical
3. Repository: APC's location field 4. Delivery Time: 2 months by the P / APC.
NB: The certificate of division is considered withdrawn, one year after its notification.
certificate of fragmentation is not worth planning certificate.

0 comments:

Post a Comment